 |
European Causeway arrives at MacKean Quay at
1830 on 11/7/06 - her final crossing prior to standing down from service
for a few days off for maintenance. European Mariner can be
seen loading at Chaine Quay for Troon as cruise ship Athena was on
the Mariner's usual loading berth at Curran Quay. |
 |
After discharging her cargo and after the departure
of Athena, European Causeway shifted down to Curran Quay to undergo
maintenance work on 11/7/06 until she re-entered service with the 0730
from Larne on the 13/7/06. |
 |
Shortly after noon on the 12/7/06 and left to
right: European Causeway is at Curran Quay undergoing a dive survey
of her hull; European Highlander is loading for the 1330 to
Cairnryan; Express on Chaine Quay is loading for the 1255 to
Cairnryan while Stena Seafarer is at Continental Quay. The
'Seafarer later sailed for Fleetwood in place of Stena Leader
at 1945. |
 |
European Highlander pictured outward from
Larne with the 1330 to Cairnryan on 12/7/06. The Highlander
departed Larne for dry docking at Falmouth the next morning at 0845. |
 |
Stena Seafarer sailing to Fleetwood at 1945
on 12/7/06. |
 |
On the 13/7/06, European Mariner is pictured
at Larne arriving from Cairnryan with the 1330 sailing. |
 |
European Mariner passes the moored Stena
Leader outward with the 2000 sailing to Cairnryan |
 |
Pictured bow in at Curran Quay the European
Mariner spends some of her down time on the 17/7/06 undergoing
maintenance work. Whilst providing relief cover at Cairnryan the
Mariner has become quite a bit more busy compared to her single round
trip on the Troon freight service. |